Showings begin today @ 12:30pm. Open floor plan, vaulted ceilings and skylights allow for loads of natural light. The private yard is a sanctuary and backs to public park land with miles of walking...
1.Roof ridge part:
The main reasons for water leakage in this part are as follows: the wave crest at the ridge is too high, and the roof ridge cover plate can not be waterproof; the longitu...
Skelmersdale-based Raised Floor Solutions has secured a substantial six-figure loan through the Government’s Coronavirus Business Interruption Loan Scheme (CBILS) from Lloyds Banking Group.
The spe...
Advantages and disadvantages of steel structure
1、 The weight of steel structure is light and the volume weight of steel structure is relatively large. Compared with other building m...
The seismic design of high-rise steel structure buildings should adopt the design method. For the elastic analysis under frequent earthquakes, the elastic analysis of multi-storey and high-rise st...
Due to the frequent fluctuation of raw material price of steel structure project in recent years, and the range of rise and fall is too large, in order to ensure the safety, quality, progress, inv...