The application of light steel structure in pharmaceutical workshop has been more and more extensive. It has solved the problems that should be paid attention to in the construction, constant temp...
8、 The embedded bolts of bearing shall not be inspected and accepted before the installation of steel roof truss
Before the installation of steel roof truss, the installation unit does not check ...
Foundation works are underway for the 16-story office building at 555 Greenwich Street in Hudson Yards. The building was originally named 561 Greenwich Street and covers an area of 270,000 square...
1.Improving the fire resistance of factory buildings
Steel has a direct impact on the fire resistance of the plant. Because the steel is not resistant to high temperature, under high temperature e...
Steel structure workshop has become the main building system for more and more enterprises to expand and build new factories.The steel structure workshop is mainly composed of two main systems: ma...
1、 If there is a gutter, the tie bar cannot be designed close to the top of the column, otherwise the downpipe may not be installed.In addition, the position of gutter downpipe and tie bar as wel...