Foundation works are underway for the 16-story office building at 555 Greenwich Street in Hudson Yards. The building was originally named 561 Greenwich Street and covers an area of 270,000 square...
Construction company Bouygues Bâtiment International has built Clement Canopy, a pair of 140-metre-high towers made of prefabricated concrete modules.
Bouygues Bâtiment International claims the d...
Our construction personnel, in the construction, it is best to observe, to know their actual situation, so that when the construction can be carried out better, the steel structure workshop is the...
The steel structure processing plant finds that the steel structure engineering is widely used nowadays, with the advantages of easy installation, fast engineering construction, short cycle time, ...
Common problems in steel structure design:
1.The middle column of multi span portal frame is designed as swing column, but in the actual project, the middle column and inclined beam are weld...
The fire protection methods of steel structure parts mainly include coating protection, fire board protection, concrete protection, flexible coil protection, inorganic fiber protection, water cool...