The waterproof of steel structure roof is a prominent problem in the construction of workshop.The leakage of steel structure roof is serious because of installation construction, roof elastic defo...
Text description provided by the architect. The project is located in Guangzhou Traditional Industrial Area / West Bank of the Pearl River. The original building was built in the 1950s as a granary...
Dutch architecture firm Studionedots has transformed a former railway warehouse in Utrecht into a cluster of co-working and public spaces called Bovenbouwwerkplaats.
To celebrate the “roughne...
1. assembly
During assembly, there is no assembly jig for welding H steel, which results in the height width ratio specification error of H steel, and the web is deviated from the management cente...
An 18-acre house built at the foot of the Blue Ridge Mountains in 1947, a tiled house in Madison, and a 1912 Tudor artisan in San Francisco.
The house is called Rosebay and is located in a historic...
Construction factors
1)In the process of construction, the roof enclosure is not protected, and the roof is trampled randomly, which damages the flatness of the roof, and even cracks appear...