We have updated our terms and conditions and privacy policy Click “Continue” to accept and continue with ET Auto
Dear user, ET Auto privacy and cookie policy has been updated to align w...
A three-story mixed-use commercial building is being constructed at the Columbia Tech Center in East Vancouver adjacent to Clark College on the Columbia Tech Center campus.
The complex, located at ...
1. assembly
During assembly, there is no assembly jig for welding H steel, which results in the height width ratio specification error of H steel, and the web is deviated from the management cente...
At present, steel structure has been widely used in factory buildings.The main components of steel structure workshop are welding H-shaped steel column, beam and brace.If the welding deformation i...
Urban life, it seems that every day is spent on the bustle,
In high-rise buildings constructed of reinforced concrete,
Locked up his breath, forgetting the taste of freedom.
I want to have a yard,
...
For the steel structure workshop, it is common for the roof fan aerated building to conduct natural ventilation cooling, as shown in the following figure.However, during the construction of Wuhan ...